Friday, August 24, 2012

Drive way poured





 











Today the driveway was poured and will be cut Sunday or monday. Monday gone all the electrical was done the air con guys came put the vents in today, there's not much left to do. The few things to go is carpet, main floor tiling, change the handles as they put wrong ones in, mirror doors on wardrobes, kitchen appliances and outside just needs the air con unit.

6 comments:

  1. House is looking good your on the home strectch now. We are hoping to get the plants delivered this weekend fingers x!
    How long til you get keys?

    ReplyDelete
  2. hi adrii
    thanks its been forever today we are at 20 weeks of build time, not sure as things have stoped since mondays cleaning and tiles havnt been booked in yet and the other things to do is change the wrong handles and carpet goes in after tiles so we are guessing they are finishing a job around the corner than they will head over to us but they wont tell us that. when do they put the mirror robes in?

    ReplyDelete
  3. They put mirrors in the same time when did the bathroom mirrors and shower screens. Be on there back about it.

    ReplyDelete
  4. The only thing holding the tiles from being done are mirrors in robes and changing wrong handles and the past 2 days no one has been on site so getting annoyed

    ReplyDelete
  5. We were waiting on tiler too at the time. I found that only worked towards at the end of each week idont know why. When we has our walk through he didn't do 2 tiles :-/ one in the store room and the other in the kitchen so they chased him up.
    Allan was pretty good though any dramas I had he chase it up.

    ReplyDelete
  6. Yeah we liked Allen too his the man that gets things done and booked in everything seems quicker rather than going thur head office, we also had a lot to do with each tradie as we wanted to make sure things were done right we met Chris the painter who did our feature wall and different color in media room and fixed up the horride iron on the roof and Fred the driveway man who straighten the driveway up instead of having it on an angle from front pier to footpath.

    ReplyDelete